The new cost range and train speed are being announced as a "reset" of the delayed, over-budget and vastly scaled-back project is carried out.
HS2 costs could top £100bn and trains will be slower than first planned
The new cost range and train speed are being announced as a "reset" of the delayed, over-budget and vastly scaled-back project is carried out.
Cite this article
<a href="https://desdunia.com/business/hs2-costs-could-top-ps100bn-and-trains-will-be-slower-than-first-planned" target="_blank" rel="nofollow noopener">HS2 costs could top £100bn and trains will be slower than first planned</a> (Desdunia, 2026-05-19)
[HS2 costs could top £100bn and trains will be slower than first planned](https://desdunia.com/business/hs2-costs-could-top-ps100bn-and-trains-will-be-slower-than-first-planned) — Desdunia (2026-05-19)
https://desdunia.com/business/hs2-costs-could-top-ps100bn-and-trains-will-be-slower-than-first-planned
<blockquote cite="https://desdunia.com/business/hs2-costs-could-top-ps100bn-and-trains-will-be-slower-than-first-planned">HS2 costs could top £100bn and trains will be slower than first planned</blockquote>
<p>Source: <a href="https://desdunia.com/business/hs2-costs-could-top-ps100bn-and-trains-will-be-slower-than-first-planned" target="_blank" rel="nofollow noopener">Desdunia</a></p>